STEEL AND METAL CONSTRUCTION
Sports Centre 4win, Winterthur
- 250 tons of hot-rolled hollow sections
- Welded tubes for cold and heat distribution
- Special transport for hollow sections
(lengths up to max. 20 meters)
- Just-in-time site delivery
Flood protection, Langnau am Albis
- 170 tons of concrete-filled, seamless thick-wall tubes
- dimension: 406,4 x 30 / 406,4 x 50 mm
- Ready to use, with welding works, in various lengths
- Just-in-time site delivery
Adidas Office Building, DE-Herzogenaurach
- 200 tons of seamless steel tubes
- Dimensions 508 x 20 mm
- Ready to use, cut to various lengths
Signal bridges motorway A9,
Canton Valais
- 100 tons of cold-rolled hollow sections
- Dimension: 500 x 500 x 12 mm
- Ready-made cut to size, in various lengths and mitres
Approaches Airport, Zurich
- 60 tons of longitudinal welded steel tubes (457 x 12.5 mm)
- Various plasma laser processing operations
- Weld seam preparation
- Ensuring traceability for each individual component
Event platform water lily,
Lake Lucerne
- Spiral-welded steel tubes in dimensions 813 x 10 mm
- Just-in-time delivery
Elephant Park Zoo Zurich
- 90 tons of hot-rolled hollow sections
- Up to dimension 300 x 200 x 16 mm
- Ready-made cut to size, in various lengths and mitres
- Just-in-time site delivery
Supports for Production Buildings Novartis, Stein
- 200 welded structural tubes
- In lengths up to 18 m and diameters up to 610 mm
Facade of Proman office building, Wollerau
- 80 tons of cold-rolled hollow sections
- In the dimension 300 x 200 x 6 mm
- Blasted, zinc dust primed and mitre cut
Pylons for Wankdorfplatz, Bern
- Longitudinally welded steel tubes, dimension 660 x 20 mm
- In lengths of 6'460 mm and mitre cut